SmartWaste records waste against a phase of a project, for example enabling works, construction or post-completion. Every ticket sent to SmartWaste needs a phase. This article shows the three ways to supply one.
Before you start
The site address must already be linked to a SmartWaste project.
Option A: Set the phase on the address (recommended)
Open the site address.
Go to Project Phases.
Add the phases for that address. They are pre-filled onto every ticket raised for the address.
Option B: Set a fallback for all tickets
Go to Administration > System Settings > External Systems > SmartWaste.
Set Default Project Phase.
Save. Weighsoft uses this whenever a ticket and its address have no phase.
Option C: Fix a failed posting
Open the failure message for the ticket.
Set the phase directly in the message.
Post again.
Projects that have already finished
SmartWaste will not accept new data against a project more than three months after it completed.
Change the phase to Post-Completion.
Post again.
If it still fails, contact SmartWaste.
Expected outcome
Tickets post without the error "No project phase found on the address, transaction or default settings".